30 June - First expedition members leave England with the minibus and trailer, and car. -
1 July - Minibus engine seizes up near Saint Maixent L'Ecole in France. -
2 July - Car and trailer depart from Saint Maixent L'Ecole for Los Lagos with two drivers. Two drivers stay with the minibus. Rest of expedition members take train to Los Lagos. -
3 July - Car and trailer with most of expedition gear arrive at Los Logos in the early morning. Remainder of expedition members arrive in the evening. -
4 July 2/7 Cave rigged to Graham's Todger Pitch. ADS, PAR, RB
5 July 66/5 Cave rigged, Wormhole hammered open, Right Said Fred discovered. GL, DEL
5 July 2/7 Cave rigged to Armageddon Ledge. PMM,TSH,SB, SJP
6 July Area 5 67/5 and 68/5 discovered. GL  
6 July 2/7 Cave rigged to bottom of Tbe Hundred. ADS, DEL, RE
7 July Area 4 5/4, 7/4, 9/4, 1014, 15/4 and 16/4 located. 15/4 bottomed. TSH, DEL, PAR
7 July Area 5 67/5 and 68/5 dug without success. GL, RB, ADS
8 July - Minibus arrives at Los Lagos with a new engine -
8 July Area 4 10/4 and 11/4 descended. GL
8 July Area 11 8/11 located, 13/11, 14/11, 15/11 investigated. PMM, SB
8 July 66/5 1991 limit passed through tight squeeze, to 1992 limit, a tight sump. ADS, DEL, PAR
9 July 2/7 Rope carried to the end of the rifts. DEL, DIM, SB, SJP
9 July 2/7 Cave rigged to Crash Pad. ADS
9 July 8/11 Cave rigged to 1991 limit and next pitch partially descended. PMM, SJP
10 July Area 11 16/11 and 17/11 discovered. SB, SJP
11 July 53/5 Entrance series rigged in search of the elusive draught. Source traced to draughting choke beyond Piranha Pendule. GL, SB
11 July 2/7 Camping kit carried to the end of rifts. DJM, SB, SIP, ADS
12 July 2/7 First camp goes down and returns after running into difficulties on the way in. DEL, PAR, RB, ADS
12 July 2/7 Seventh Heaven rerigged. DJM
12 July Area 4 5/4 located and descended. TSH, SB, SIP
13 July Area 4 5/4 bottomed, 9/4 descended. TSH, SB, SIP
13 July Areas 7 & 9 43/7, 44/7, 45/7, 46/7, 16/9, 17/9, C5 investigated.
GL
14 July - Shaft bashing: cut short when cavers became separated. DRB, GL
14 July Area 4 9/4 investigated. TSH, PAR
14-16 July 2/7 Second camp goes down. Day 1 - Camp set up on Big Ledge.  Day 2 - Tantalus descended, upstream extended to just beyond  the Blowhole. Day 3 - Returned to Surface. PMM, ADS, RB, DEL
15 July Area 4 9/4 bottomed. TSH, PAR
15 July Area 12 27/4, 6/12, 7/12, 8/12, 9/12, 10/12 found. GL
16 July 2/7 Rope carried to Armageddon Ledge. CJL, SB, DJM
16 July 53/5 Rift beyond Piranha Pendule pushed. GL, PAR
17-20 July 2/7 Third camp goes down. Day 1 - Travelled to camp, laying telephone cable. Day 2 - Tackle retrieved from Primula Point, IWWI Streamway discovered and explored. Upstream axtensions surveyed from Windy Sump to Pans Metro. Day 3 - Upstream extensions surveyed from Big Ledge to Paris Metro. Dead Sea discovered. Day 4 - Returned to surface. DRB, DJM, TSH, SB
17 July Area 5 Various entrances near 66/5 examined. GL
18 July Area 5 69/5 in the Valley of Dry Bones dug open. GL, DH, SJP
19 July Area 10 13/10 Cave in Green Ridge' investigated. GL
19 July 8/11 Cave extended to Peanut Pot. PMM, SJP
19 July Area 4 Shaft bashing. DH, CJL
20 July 8/11 Big Chamber found. Entrance series surveyed. GL, SJP, ADS, CJL
21-25July 2/7 Fourth camp goes down. Day 1 - Travelled to camp. Day 2 - Downstream leads investigated. Day 3 - Dead Sea Strolls discovered. Day 4 - Downstream leads investigated. Day 5 - Returned to surface. ADS, CJL
22 July 69/5 Digging DH, GL, SJP
24-28 July 2/7 Fifth camp goes down. Day 1 - DEL and PAR travelled to  camp. Day 2 - TSH and DIM travelled to camp, rift explored  upstream. Day 3 - IWWI Streamway pushed and surveyed to upstream limit. Oregano Pitch rigged. Day 4 -Upstream surveyed from Oregano Pitch to Windy Sump. Day 5 - Returned to surface. PAR, DEL, DJM, TSH
24 July 8/11 Start of Insalubrious found by climbing out of Big Chamber. Cave surveyed to third pitch. GL, SJP
24 July Areas 4 & 12 Dowsing JDW
25 July 8/11 Cave surveyed to Peanut Pot. Rest of Insalubrious, Sloping Chamber and Passage With No Name Yet explored. HMS, DH, GL
26 July Area 5 Dowsing. JDW
26 July 2/7 Photography equipment carried to end of rifts. HMS, SB, SJP
26 July Area 9 Shaft bashing. DH, MH
27 July   Cave surveyed from the top of Peanut Pitch to the end of Insalubrious GL, CJD, FAB
27 July 53/5 Entrance series examined in search of missing draught. TCG, SJP, JC
28 July 8/11 Rio Pequeño discovered and explored upstream to dry sump and downstream to end of El Meandro. Surveyed from end of Insalubrious to dry sump. GL, CJD, SJB
  69/5 Digging TCG, CJD, HMS, ML
28 July - 1 August 2/7 Sixth camp goes down. Day 1 - Travelled to camp. Day 2 - Photography in Just Awesome. Day 3 - Photography in Just Awesome. Day 4 - MH and DRB return to surface, ADS and JC investigate leads downstream. Day 5 -  ADS and JC return to surface. MH, DRB, ADS, JC
29 July Area E Surface prospecting. E9 discovered. ML, CID, HMS
29 July 8/11 Rio Pequeño surveyed downstream to bottom of third pitch and extended to sump. GL, FAB, SB
29 July 8/11 Climbs and pitches investigated. Very Big Chamber, 11 O'clock High and Map Room discovered. TCG, SJP
30 July 8/11 Very Big Chamber surveyed. CJD, HMS, SJP
30 July 8/11 Boulder choke at bottom of Peanut Pitch dug open and coonected to Very Big Chamber. 11 O'clock High surveyed. Bottom of 3rd pitch investigated. TCG,SB
30 July Area G Caves G1, G2 and G3 investigated DH, ML
31 July 8/11 El Meandro and route through choke from Peanut Pitch to Very Big Chamber surveyed. GL, CJD, ML
31 July 8/11 11 O'clock High surveyed to the end. Leads in Very Big Chamber investigated TCG, DH
31 July Area 4 Dowsing. JDW
31 July - 4 August 2/7 Seventh Camp goes down. Day 1 - SB and TSH travelled to 4 August camp. Day 2 - DJM travelled to camp. TSH and SB surveyed high level routes in Grisly Rift. Day 3 - Upstream photognphed as far as Windy Sump. Day 4 - Upstream photographed to Oregano Pitch. Day 5 - Returned to surface. SB, TSH, DJM
1 August 2/7 Carried photo gear to the end of Rifts with DJM. DEL
2 August  8/11 Lower streamway surveyed. GL, DH, MH
3 August 2/7 Somnambulist Series pushed and surveyed. Tackle removed. DEL, PAR
3 August 8/11 Cave extended to top of The Unwell. TCG, CJD
3 August F54 Cave discovered. GL, MH
4 August 49/5 Cave rediscovered and extended. DEL, PAR
4 August 8/11 Wet Cheeks rift surveyed. Explored down The Unwell and   along Codeine Phosphate Rift. MH, JC, HMS
5 August E9 Cave bottomed. CJD, ML, JC
5 August 49/5 Squeezes hammered open. DEL, PAR
5 August 16/11 Cave bottomed. SB, SJP
6 August 8/11 Surveyed to Fever Pitch. CJD, ML, JC
6 August 53/5,  69/5 Caves derigged. GL
6 August 70/5 Cave discovered and dug open. DEL, PAR
7-8 August 2/7 Derigging camp. Day 1 - Travelled to camp. Day 2 - Packed camp and returned to surface, detackling cave to Armageddon Ledge. DEL, SB, SJP, TETK
8 August 2/7 Tackle retrieved from the end of the rifts. DJM, HMS
8 August 8/11 Surveyed to end of Codeine Phosphate Rift. JC, GL
9 August 8/11 Pushed and surveyed down October along streamway to sump and along Big Wind. JC, GL
10 August 2/7 Tackle retrieved from Armageddon Ledge. JC, DJM, HMS
10 August 66/5 Cave derigged. GL
11 August 8/11 Rio Pequeño derigged GL, EB
11 August 2/7 Cave detackled to top of Pessimists Pot. Tackle bags removed from cave. DJM, TSH, TETK, DRB, HMS
12 August 8/11 Remainder of cave derigged GL, SJP
13 August 2/7 1500m of rope and all remaining tackle bags removed from cave. GN, IA, SJP, SB, DRB, DJM, HMS, EB
14-17 August - All equipment carried down from entrance of 2/7 and Ario Camp to Los Lagos. -
18 August - Minibus and trailer leave Los Lagos. -
20 August - Minibus arrives back in England. -