Oxford University Cave Club

2001 Expedition: "Xitu"

Picos de Europa, Spain

Expedition Diary

Xitu 2001 Report Contents

Other Expedition reports

OUCC Home Page

 

Previous section : Next section

Date

Cave

What

Who

8/7/01

 

Leave Oxford

LM, SR, AW, JC, RD

9/7/01

 

Arrive at Los Lagos, sleep at the Maria Rosa

LM, SR, AW, JC, RD

10/7/01
11/7/01

 

Obtain Supplies, set up Ario camp

LM, SR, AW, JC, RD, BL, CM

12/7/01

12/5

Rigged to the bottom of Oasthouse, Paul got stuck in the Newt.

JC, RD, PG, EL

13/7/01

12/5

Rigged to the base of Milliways

BL, CM

14/7/01

12/5

Rigged to the base of Armadillo 1

RD, EL

14/7/01

1/5

Rigged to the traverse pitch

SR, LM

14/7/01

1/5

Portering trip

PC, CR

14/7/01

12/5

Newt practise session / re-rig

JC, AW

15/7/01

1/5

Rigged to the bottom of Bluewater 1

JC, PG

15/7/01

12/5

Rigged to Shaven Hedgehog

BL, CM

16/7/01

1/5

Rigged to Custom Hall

JC, PC, CR

16/7/01

 

Shaftbashing in Area 4

SR, BL, CM

16/7/01

12/5

Portering trip

PG, EL

16/7/01
17/7/01

12/5

Re-rigged Shaven Hedgehog, Andrew got stuck in the Newt overnight

AW, RD

17/7/01

1/5

Portering trip upstream

SR, PC, PG

17/7/01

 

Shaftbashing in area 4

BL, CM, JC

17/7/01

12/5

Rigged to Thomson's Gesellshaft

EL, GN

18/7/01

40/4
39/4

Digging trip

BL, CM, AW, PG

18/7/01

 

Shaftbashing in area E, located E12 entrance

SR, EL

18/7/01

1/5

Began the bolt-climb at the upstream aven

JC, BM, LM

19/7/01

12/5

Rigged to the pitch before the Icing on the Cake

PM, RD

19/7/01

39/4

Digging/pushing trip

PM, BL, CM, SR

20/7/01

39/4

Pushed to too tight rift

JC, AW, SR

20/7/01

12/4

Pushing trip

BL, CM

20/7/01

12/5

Portering trip

BM, LM, PG

20/7/01

1/5

Bolting upstream

CR, PC, PM

20/7/01
21/7/01

12/5

Pushing trip through window in the Heath - no high levels found.

ES, GN

21/7/01

 

Shaftbashing in areas 4 and 12

EL, RD

22/7/01

2/7

Rope retrieval

BM, LM

22/7/01

1/5

Portering trip

PG, HS

22/7/01

1/5

Phototrip upstream

BL, CM, JC

22/7/01

1/5

Bolting upstream

PC, PM

22/7/01

12/5

Pushing trip, found Crumble Inlet

EL, RD

23/7/01

2/7

Rope retrieval

BM, LM, CR, HS

23/7/01

1/5

Examining the Gap

PC, PG

23/7/01

 

Shaftbashing around Oston

PM, GN, ES

24/7/01

12/4

Pushing trip

ES, GN

24/7/01

1/5

Examining the Teresa Series

BM, CR, AW

25/7/01

 

Shaftbashing in the Extremero Valley

CM, ES, GN

25/7/01

1/5

Upstream, discovered passage to Totem Chamber

PM, PC, HS

25/7/01

1/5

Teresa Series

BM, LM

25/7/01

12/5

Bolt climb up Crumble Inlet to aven

EL, RD

26/7/01
27/7/01

1/5

Upstream, bolted to the top of the aven

ES, GN

27/7/01

53/5

Found bolts from a previous year

CR, HS, CM

27/7/01

1/5

Surveyed to Totem Chamber

PC, PM, BM, AW

28/7/01

29/5

Examined too tight rift

ES, GN

28/7/01

12/5

Survey Crumble inlet

RD, PG

28/7/01

 

GPS logging entrances in area 4

JW

29/7/01

39/4

Survey and de-rig

AW, HS

29/7/01

 

Shaftbashing in area 4

CR, CM

29/7/01

 

GPS logging entrances in area 4

JW

30/7/01

12/5

De-rig

RD, CM, PC, EL, HS, PG

30/7/01

 

Shaftbashing in area 4

CR, AW

1/8/01

 

GPS logging in area 4

JW

2/8/01

1/5

Gap area

CR, PC

2/8/01

1/5

Surveying upstream to sump

AW, PG, HS

2/8/01

 

GPS logging in area 4

JW

3/8/01

 

Shaftbashing in area 4

CR

4/8/01

 

Shaftbashing in area 4

CR, HS

4/8/01

1/5

Discovered Monolith Chamber, Hyperventilation Chamber and more

PC, RD

5/8/01

 

Shaftbashing in area 4

CR, PC, PG, JW

6/8/01

1/5

Surveying the new finds

PC, CR, HS, PG, AW

6/8/01
7/8/01

F80

Rigging traverse

HG

6/8/01

E12

Trying to shift Bertha

EL, CM

7/8/01

E12

Trying harder to shift Bertha

EL, CM

8/8/01

1/5

Climb into possible sump bypass, found to be dead end

RD, HG

8/8/01

1/5

Upstream pushing

PC, PG, AW

9/8/01

28/4

28/4 Bashing

CR, CM

11/8/01

1/5

Derigging Teresa Series

PG, HG

11/8/01

28/4

28/4 Bashing

CR, AM

11/8/01

1/5

Started traverse to hole in Hyperventilation Chamber

JP, PC

12/8/01

F80

Rigged to upper window, found boulderchoke!

HG, RD

12/8/01

 

Shaftbashing, found 54/4, 55/4, 56/4

CR, PC, ML

13/8/01

F80

Derigged

HG

13/8/01

E12

Trying to shift Bertha

RD, EL

13/8/01

54/4

Dug entrance open in a storm

PC, CR

13/8/01

 

Shaftbashing in area 11

ML, JP, AM

14/8/01

54/4

Pushed to pitch below Velcro Squeeze

CR, PC

14/8/01

1/5

Upstream trip

PG, SG

14/8/01

E12

Past Bertha, digging below

RD, EL

15/8/01

1/5

Continued traverse to hole in Hyperventilation Chamber

PC, JP, AM

15/8/01

 

Shaftbashing in area 5/G, found G22

ML

15/8/01

54/4

Re-rigging and pushing

PG, CR, AW

15/8/01

E12

Digging, derigging

RD, EL

17/8/01

1/5

Reached hole in Hyperventilation, derigged to Custom's Hall

RD, PG

18/8/01

1/5

Derigged Completely

PG, RD, ML, SG

18/8/01

G22

Dropped first pitch

ML, SG

19/8/01

54/4

Pushed to -90m, surveyed and derigged

RD, SG, PG

20/8/01

G22

Bottomed, surveyed

RD, SG, PG

21/8/01
22/8/01
23/8/01

 

Derig Ario Camp, visit Field Agent

PG, AW, ML, RD, SG

24/8/01

 

Left Los Lagos

PG, AW, SG, RD

28/8/01

 

Arrive safely back in Oxford